Siemens 6GK5206-2BS00-2AC2 SCALANCE XC206-2SFP Switch
Siemens 6GK5206-2BS00-2AC2 SCALANCE XC206-2SFP Switch
Siemens 6GK5206-2BS00-2AC2 SCALANCE XC206-2SFP Switch
/ 3

Siemens 6GK5206-2BS00-2AC2 SCALANCE XC206-2SFP Switch

  • Manufacturer: Siemens

  • Part Number: 6GK5206-2BS00-2AC2

  • Condition:New with Original Package

  • Product Type: Managed Industrial Ethernet Switches

  • Country of Origin: USA

  • Payment:T/T, Western Union

  • Shipping port: Xiamen

  • Warranty: 12 months

Siemens 6GK5206-2BS00-2AC2 SCALANCE XC206-2SFP Managed Industrial Ethernet Switches

The Siemens 6GK5206-2BS00-2AC2, also cataloged as the SCALANCE XC206-2SFP Managed Layer 2 Industrial Ethernet Switch, operates as a dedicated hardware component for managed multi-port packet routing and hybrid copper-fiber media conversion within industrial Ethernet networks.

Hardware Specifications

Parameter Specification
Model 6GK5206-2BS00-2AC2
Brand Siemens
Origin Germany
Weight 0.6 kg
Dimensions 125 mm x 100 mm x 75 mm
Operating Temp 0 deg C to +60 deg C
Power Consumption 10 W
Port Configuration 6 x RJ45 (10/100 Mbit/s), 2 x SC fiber optic ports, 1 x console port
Switching Method Store-and-forward
Power Supply Redundant 24 V DC
Enclosure Rating IP20

Profinet and Deterministic Network Integration

The switch integrates natively with Profinet IO and ring redundancy protocols (MRP/RSTP) to execute deterministic frame scheduling across mixed copper and optical fiber infrastructures. By processing data streams via store-and-forward switching mechanisms, the hardware maintains low packet latency and reliable frame delivery. Furthermore, the embedded C-PLUG configuration slot enables instant firmware flash compatibility and rapid device replacement without manual parameter re-engineering.

Frequently Asked Questions

Q: How does the C-PLUG memory module function during a hardware replacement event?

A: The C-PLUG removable media stores complete configuration parameters, network topologies, and device firmware. Inserting the C-PLUG into a replacement switch of the same model automatically transfers all operational settings, eliminating manual reprogramming requirements.

Q: What happens to active data transmission if one of the redundant 24 V DC power inputs drops out?

A: The internal power management circuitry switches instantly to the secondary 24 V DC input feed via diode decoupling, maintaining uninterrupted packet forwarding and signaling an error state through the hardware error-signaling contact.

Field Installation Guidelines

Mount the switch securely onto a standard 35 mm DIN rail, an S7 mounting rail, or fasten it directly to a flat panel surface using the integrated screw channels. Connect the redundant 24 V DC power lines to the removable terminal block while verifying correct polarity and low-impedance earth grounding. Insert copper cables into the RJ45 ports and optical connectors into the SC fiber ports, ensuring proper latch engagement. Maintain a minimum vertical clearance of 50 mm above and below the enclosure to accommodate thermal dissipation profiles. Route communication cabling away from high-voltage lines and variable frequency drives to prevent electromagnetic coupling.

You may also like